San Antonio River Authority – Guenther/Euclid Stormwater Retrofit

By | 2017-06-26T21:34:37+00:00 May 15th, 2017|General Contractor|

Project consisted of installation of a new permeable paver parking lot; 8 bioretention areas with under-drains used to treat onsite stormwater runoff; installation of 8 cistern stormwater tanks that capture the rainwater from the building; Installation of exterior improvements to include rock walls, concrete flatwork, seal coat of existing parking lot, and new landscape and [...]

Comments Off on San Antonio River Authority – Guenther/Euclid Stormwater Retrofit

Install Mini Split Systems, Fort Hood AFB

By | 2017-06-26T21:34:01+00:00 May 5th, 2017|Federal 8a, General Contractor|

Project consisted of new mini split systems for 23 buildings in Fort Hood. Installation included new electrical, mechanical, and plumbing to alleviate the need for existing HVAC systems to operate continuously.

Comments Off on Install Mini Split Systems, Fort Hood AFB

SAWS Chilled Water Plant Improvements, San Antonio, TX

By | 2017-06-26T21:34:29+00:00 May 5th, 2017|General Contractor|

Project included: Complete restoration of 3 existing concrete fountains to include new underground plumbing, electrical, and pump installation. Exterior improvements included stamped concrete pavers and new landscape and irrigation.

Comments Off on SAWS Chilled Water Plant Improvements, San Antonio, TX

San Antonio River Authority – Helton Nature Park

By | 2017-06-26T21:34:23+00:00 March 1st, 2017|General Contractor|

Project consisted of a 1.5 mile stretch of new trail and parking spaces to include lime stabilization, base course, and chip seal topping. Additional improvements were 2 new concrete culverts, 6 BMP areas, and a concrete culvert crossing that included a replacement of an underground steel encased water line.

Comments Off on San Antonio River Authority – Helton Nature Park

Install Trash Boom over Zarzamora Creek, San Antonio

By | 2017-06-27T19:41:33+00:00 June 27th, 2016|General Contractor|

Owner - San Antonio River Authority Type: General Contractor Completion Date: June 2016 Project consisted of installing 150LF of heavy duty containment boom anchored to two 20' concrete piers on either side of the San Antonio River. Any trash or debris accumulated will be contained to this area and makes its way down the boom [...]

Comments Off on Install Trash Boom over Zarzamora Creek, San Antonio

Alamo Colleges – First Responders Academy Access Drive, San Antonio, TX

By | 2017-06-26T21:34:18+00:00 March 1st, 2016|General Contractor|

Project consisted of a new concrete access drive to the fire academy college. Installation of lime treated subgrade, cement stabalized base, and 30,000 square feet of 8" thick concrete paving. Exterior improvements included new concrete culvert, fencing, entrance gates, striping, ADA access, and landscape.

Comments Off on Alamo Colleges – First Responders Academy Access Drive, San Antonio, TX

Ft Hood Repair of Concrete Catwalk on ATC Tower, San Antonio, TX

By | 2016-01-06T21:00:51+00:00 September 30th, 2015|Concrete Work, General Contractor, Site Work|

View Project Sheet PDF Ft Hood Repair of Concrete Catwalk on ATC Tower San Antonio, TX Completed: July 2015 Project Size: $ Project consisted of installation concrete mechanical stairs, new sidewalks, curb, asphalt paving, utilities, and other site work. Placement of shoring for new stairs (excavation of approx. 14’), and demo/saw cut opening in existing [...]

Comments Off on Ft Hood Repair of Concrete Catwalk on ATC Tower, San Antonio, TX

SAWS 2015 – 2017 Annual Concrete Placement Work Orders, San Antonio, TX

By | 2016-12-08T21:53:51+00:00 July 15th, 2015|General Contractor|

View Project Sheet PDF SAWS 2015 - 2017 Annual Concrete Placement Work Orders San Antonio, TX Completed: July 2016 Project Size: $ Furnish all materials, equipment, labor and supervision for the construction of concrete curbs, sidewalks, driveways, retaining walls, steps, rip rap, other designed concrete items, and associated work on an annual work order contract [...]

Comments Off on SAWS 2015 – 2017 Annual Concrete Placement Work Orders, San Antonio, TX

Randolph AFB B Wing Utility Relocation Bldg 499, San Antonio, TX

By | 2016-01-06T21:01:01+00:00 July 15th, 2015|Concrete Work, Federal 8a, General Contractor|

View Project Sheet PDF Randolph AFB B Wing Utility Relocation Bldg 499 San Antonio, TX Completed: July 2015 Project Size: $ Project consisted of installation concrete mechanical stairs, new sidewalks, curb, asphalt paving, utilities, and other site work. Placement of shoring for new stairs (excavation of approx. 14’), and demo/saw cut opening in existing concrete [...]

Comments Off on Randolph AFB B Wing Utility Relocation Bldg 499, San Antonio, TX

United Airlines Blast Booth, San Francisco, CA

By | 2016-01-06T21:00:15+00:00 June 25th, 2015|General Contractor, Site Work|

View Project Sheet PDF United Airlines Blast Booth San Francisco, CA Completed: June 4, 2014 Project Size: $ Install new 15’ x 40’ Blast Room for United Airline at San Francisco International Airport. Turnkey Installation included self cleaning grated floor, new ducting from blast room to include new penetration to outside side dust collector with [...]

Comments Off on United Airlines Blast Booth, San Francisco, CA