Lackland AFB, Texas
Completed: 2020
Project Size: $3M
RCO was the prime contractor for this design-build project that consisted of the relocation of 9 existing aircraft from the current Vietnam Airpark to the new site near the Parade Field. Work included: aircraft relocation, pier and cap foundations, vigorous traffic control/closures, pedestrian sidewalks, demolition, grading, and landscape.