UTSA Rec Pool Facilities, San Antonio, TX

By | 2017-06-26T21:34:42+00:00 June 8th, 2017|Subcontractor|

Project consisted of new utilities run to two rec pools. Installation of 6" french drain, new 12" storm drain line, underground domestic water, sanitary sewer. Exterior improvements included concrete flatwork, retaining walls, and catch basins. General Contractor: Byrne Construction

Comments Off on UTSA Rec Pool Facilities, San Antonio, TX

ATC 4 Aux. Parking Lot East Campus Quadrangle, Lackland AFB

By | 2016-01-14T20:14:56+00:00 December 31st, 2015|Concrete Work, Project Management, Site Work, Subcontractor|

View Project Sheet PDF Project consisted of sidewalks, curbs, asphalt paving, slab foundations, light pole bases, security walls, site utilities, and site work done at Lackland AFB for new Airman Training Complex and Parking Lot. Approx. 1.2 mile of concrete sidewalks, 8,000LF of concrete curb, a 5,000SF weapons cleaning foundation, 150 Light pole bases, 1 [...]

Comments Off on ATC 4 Aux. Parking Lot East Campus Quadrangle, Lackland AFB

Fort Sam Houston Museum Foundation Repair, San Antonio, TX

By | 2017-06-20T20:25:20+00:00 December 15th, 2015|Concrete Work, Project Management, Site Work, Subcontractor|

View Project Sheet PDF Fort Sam Houston Medical Museum Foundation Repair San Antonio, TX Completed: December 2015 Project Size: $ Provide and replace/install new soil retention system, compact with impervious soil to prevent soil and water intrusion into the crawl space. Demo existing concrete as required. Back fill and re-grade as required by the extent [...]