Repair Main Switch, Lackland AFB

By | 2017-06-27T19:40:46+00:00 June 27th, 2017|Federal 8a, General Contractor|

Owner: 502D Contracting Squadron Type: General Contractor (8a) Location: Lackland AFB, TX Project consisted of providing a fully functional Switching Station to include all labor, materials and equipment required for the expansion and repair. Security Fencing installed around Main Switch to include, 4 man gates, 3 sets of double gates, and barb wire. The additional/repairing [...]

Comments Off on Repair Main Switch, Lackland AFB

Replace Duct Heaters, Fort Hood, TX

By | 2017-06-27T19:39:52+00:00 June 27th, 2017|Federal 8a, General Contractor|

Owner: DPW Location: Fort Hood, TX Type: 8(a) General Contractor Project consisted of demolishing 5 existing in-line duct heaters and replacing them with Reznor gas furnaces and new condenser units. Custom plenum boxes and duct transition pieces were built for this project along with new gas piping, electrical, and smoke detectors that interfaced into the [...]

Comments Off on Replace Duct Heaters, Fort Hood, TX

UTSA Rec Pool Facilities, San Antonio, TX

By | 2017-06-26T21:34:42+00:00 June 8th, 2017|Subcontractor|

Project consisted of new utilities run to two rec pools. Installation of 6" french drain, new 12" storm drain line, underground domestic water, sanitary sewer. Exterior improvements included concrete flatwork, retaining walls, and catch basins. General Contractor: Byrne Construction

Comments Off on UTSA Rec Pool Facilities, San Antonio, TX

San Antonio River Authority – Guenther/Euclid Stormwater Retrofit

By | 2017-06-26T21:34:37+00:00 May 15th, 2017|General Contractor|

Project consisted of installation of a new permeable paver parking lot; 8 bioretention areas with under-drains used to treat onsite stormwater runoff; installation of 8 cistern stormwater tanks that capture the rainwater from the building; Installation of exterior improvements to include rock walls, concrete flatwork, seal coat of existing parking lot, and new landscape and [...]

Comments Off on San Antonio River Authority – Guenther/Euclid Stormwater Retrofit

Install Mini Split Systems, Fort Hood AFB

By | 2017-06-26T21:34:01+00:00 May 5th, 2017|Federal 8a, General Contractor|

Project consisted of new mini split systems for 23 buildings in Fort Hood. Installation included new electrical, mechanical, and plumbing to alleviate the need for existing HVAC systems to operate continuously.

Comments Off on Install Mini Split Systems, Fort Hood AFB

SAWS Chilled Water Plant Improvements, San Antonio, TX

By | 2017-06-26T21:34:29+00:00 May 5th, 2017|General Contractor|

Project included: Complete restoration of 3 existing concrete fountains to include new underground plumbing, electrical, and pump installation. Exterior improvements included stamped concrete pavers and new landscape and irrigation.

Comments Off on SAWS Chilled Water Plant Improvements, San Antonio, TX

San Antonio River Authority – Helton Nature Park

By | 2017-06-26T21:34:23+00:00 March 1st, 2017|General Contractor|

Project consisted of a 1.5 mile stretch of new trail and parking spaces to include lime stabilization, base course, and chip seal topping. Additional improvements were 2 new concrete culverts, 6 BMP areas, and a concrete culvert crossing that included a replacement of an underground steel encased water line.

Comments Off on San Antonio River Authority – Helton Nature Park

Install Trash Boom over Zarzamora Creek, San Antonio

By | 2017-06-27T19:41:33+00:00 June 27th, 2016|General Contractor|

Owner - San Antonio River Authority Type: General Contractor Completion Date: June 2016 Project consisted of installing 150LF of heavy duty containment boom anchored to two 20' concrete piers on either side of the San Antonio River. Any trash or debris accumulated will be contained to this area and makes its way down the boom [...]

Comments Off on Install Trash Boom over Zarzamora Creek, San Antonio

Alamo Colleges – First Responders Academy Access Drive, San Antonio, TX

By | 2017-06-26T21:34:18+00:00 March 1st, 2016|General Contractor|

Project consisted of a new concrete access drive to the fire academy college. Installation of lime treated subgrade, cement stabalized base, and 30,000 square feet of 8" thick concrete paving. Exterior improvements included new concrete culvert, fencing, entrance gates, striping, ADA access, and landscape.

Comments Off on Alamo Colleges – First Responders Academy Access Drive, San Antonio, TX

ATC 4 Aux. Parking Lot East Campus Quadrangle, Lackland AFB

By | 2016-01-14T20:14:56+00:00 December 31st, 2015|Concrete Work, Project Management, Site Work, Subcontractor|

View Project Sheet PDF Project consisted of sidewalks, curbs, asphalt paving, slab foundations, light pole bases, security walls, site utilities, and site work done at Lackland AFB for new Airman Training Complex and Parking Lot. Approx. 1.2 mile of concrete sidewalks, 8,000LF of concrete curb, a 5,000SF weapons cleaning foundation, 150 Light pole bases, 1 [...]

Comments Off on ATC 4 Aux. Parking Lot East Campus Quadrangle, Lackland AFB