Renovate Dormitory B280- Sheppard AFB, TX

By | 2020-04-13T19:46:05+00:00 April 13th, 2020|Federal 8a, General Contractor|

Sheppard AFB, TexasCompleted: 2020Project Size: $7M RCO was the prime contractor for this design-build project that consisted of an upgrade to the existing mechanical system with roofing and architectural finishes for the student pilot dormitory of approx. 260 rooms. Included the replacement of all fan coils, forced air units, and exhaust fans, installation of a dedicated outside [...]

Comments Off on Renovate Dormitory B280- Sheppard AFB, TX

Southeast Asia Airpark Relocation – Lackland AFB

By | 2020-04-13T19:30:19+00:00 April 13th, 2020|Concrete Work, Federal 8a, General Contractor, Site Work|

Lackland AFB, TexasCompleted: 2020Project Size: $3M RCO was the prime contractor for this design-build project that consisted of the relocation of 9 existing aircraft from the current Vietnam Airpark to the new site near the Parade Field. Work included: aircraft relocation, pier and cap foundations, vigorous traffic control/closures,  pedestrian sidewalks, demolition, grading, and landscape.

Comments Off on Southeast Asia Airpark Relocation – Lackland AFB

Replace Fire Water Line – Fort Hood, Texas

By | 2020-04-13T19:32:39+00:00 April 9th, 2020|Federal 8a, General Contractor, Site Work|

View Project Sheet PDF Replace Fire Water LineFort Hood, TXCompleted: November, 15 2017Project Size: $824,693.21 This project’s scope includes the demolition of approximately 10,000 square feet of concrete, excavation and removal of approximately 400 linear feet of existing water line and associated valves and hydrants. As well as installation of new 12”, 8”, and 6” [...]

Comments Off on Replace Fire Water Line – Fort Hood, Texas

Repair Main Switch, Lackland AFB

By | 2020-04-09T23:25:29+00:00 June 27th, 2017|Federal 8a, General Contractor|

Owner: 502D Contracting Squadron Type: General Contractor (8a) Location: Lackland AFB, TX Project consisted of providing a fully functional Switching Station to include all labor, materials and equipment required for the expansion and repair. Security Fencing installed around Main Switch to include, 4 man gates, 3 sets of double gates, and barb wire. The additional/repairing [...]

Comments Off on Repair Main Switch, Lackland AFB

Replace Duct Heaters, Fort Hood, TX

By | 2017-06-27T19:39:52+00:00 June 27th, 2017|Federal 8a, General Contractor|

Owner: DPW Location: Fort Hood, TX Type: 8(a) General Contractor Project consisted of demolishing 5 existing in-line duct heaters and replacing them with Reznor gas furnaces and new condenser units. Custom plenum boxes and duct transition pieces were built for this project along with new gas piping, electrical, and smoke detectors that interfaced into the [...]

Comments Off on Replace Duct Heaters, Fort Hood, TX

Install Mini Split Systems, Fort Hood AFB

By | 2017-06-26T21:34:01+00:00 May 5th, 2017|Federal 8a, General Contractor|

Project consisted of new mini split systems for 23 buildings in Fort Hood. Installation included new electrical, mechanical, and plumbing to alleviate the need for existing HVAC systems to operate continuously.

Comments Off on Install Mini Split Systems, Fort Hood AFB

Randolph AFB B Wing Utility Relocation Bldg 499, San Antonio, TX

By | 2016-01-06T21:01:01+00:00 July 15th, 2015|Concrete Work, Federal 8a, General Contractor|

View Project Sheet PDF Randolph AFB B Wing Utility Relocation Bldg 499 San Antonio, TX Completed: July 2015 Project Size: $ Project consisted of installation concrete mechanical stairs, new sidewalks, curb, asphalt paving, utilities, and other site work. Placement of shoring for new stairs (excavation of approx. 14’), and demo/saw cut opening in existing concrete [...]

Comments Off on Randolph AFB B Wing Utility Relocation Bldg 499, San Antonio, TX