Owner – San Antonio River Authority
Type: General Contractor
Completion Date: June 2016
Project consisted of installing 150LF of heavy duty containment boom anchored to two 20′ concrete piers on either side of the San Antonio River. Any trash or debris accumulated will be contained to this area and makes its way down the boom unto the 5,000 Sqft floatable concrete pad that was also installed. SARA staff will use the new concrete drive to access the debris accumulated onto the pad.